Method and assumptions
The chart treats each post hole as a full cylinder: pi times radius squared times depth. It does not subtract a post, tube wall, or gravel base.
Bag counts use 50 lb = 0.375 cu ft, 60 lb = 0.45 cu ft, and 80 lb = 0.60 cu ft. A 10% waste factor is added before each bag count is rounded up.
Before you dig
Confirm utility marking, frost depth, footing size, post spacing and local code requirements before digging or pouring.
For deck footings, structural posts, gates, retaining work or inspection-sensitive projects, verify sizing with the plans, local building department, supplier, contractor or engineer.